H.V. / L.V. installation

img

It is important when choosing an installation partner that you consider an engineering team with safety and experience at the heart of its business.

Our core team of engineers are all factory trained and many have spent time on the shop floor in assembly or inspection roles, all have many years’ experience working on site installing and subsequently maintaining industrial electrical equipment.

  • 415V Low Voltage Switchgear
  • Package Substations
  • 11,000V Primary and Secondary Switchgear
  • Oil and Cast Resin Transformers
  • 33,000V Distribution switchgear
  • Busbar Trunking

Commissioning:

After installation of the panels the following commissioning tests can be performed:

  • Complete functional check of internal panel wiring.
  • 5kV Insulation Resistance test on the panel busbar system
  • High Voltage AC pressure test on the busbar system of the panels (breakers and disconnectors open).
  • High Voltage AC pressure test on the busbar system of the panels (breakers and disconnectors closed).
  • Determination of the current transformers Magnetisation Curves.
  • Primary Injection of the current transformers (up to 600A).
  • Primary Injection of the voltage transformers.
  • Secondary Injection of the protection relays.